First fixing in Dublin 3

  • December 8, 2018
  • dandy21

The construction needed first fixing.   Ground Floor: We made new timberframes 4 x 2. We put OSB 3 for the floor.   First Floor and Extension: We made new timberfames 9 x 2. We put OSB 3 for the floor.   Second Floor: We put new timberfames 9 x 2. We put OSB 3…

Flat roof in Crumlin

  • December 8, 2018
  • dandy21

We made a flat roof on top of a garage conversion.   We made a new timberframe 6 x 2. We installed filling pieces for drainage. We put OSB 3. Torch on Felt was put afterwards.

Garage conversion in Portmarnock

  • December 8, 2018
  • dandy21

Owner wanted to conver the garage into an office.   We suspended the ceiling. We broke down the wall. We fitted the steel beam to support the roof. We made a window frame. We insulated the wall with 73mm insulated plasterboard and skim. We changed normal light with led spotlights.

Garden in Lucan

  • December 8, 2018
  • dandy21

To re design a garden. We cleared all bushes, twigs, trees and anything else and threw it in skip. We leveled the soil. We put weed control, hardcore and paving sand in order to make a footpath. We put flabs. In the middle, we made level with paving sand and fitted artificial grass.  

Garden renovation in Blanchardstown

  • December 8, 2018
  • dandy21

To renovate the garden.   We cleared most of the bushes, twigs, trees and threw in skip. We made new footpaths with slabs and space for the flowers. We made space for a new shed. We placed decoration pebbles in some parts and chippings in others. We closed the back garden with new fences.

Kitchen renovation in Stillorgan

  • December 8, 2018
  • dandy21

To renovate the whole kitchen room due to water damage.   We removed the old kitchen. We took off the plasterboard from the walls and ceiling. We installed air tightness membrane. We put new plasterboard and skimmed the walls and ceiling. We fit a new kitchen. We painted the room.      

Laminate in Ranelagh

  • December 8, 2018
  • dandy21

The old laminate was damaged So we fitted new laminate that was thinner on the floor. Our steps: We removed old laminate and trims. We installed the underlay. We fitted new laminate and trims.      

Renovation Dublin 5

  • December 8, 2018
  • dandy21

We had to break the concrete slab above the kitchen firsthand so that we can suspend the house with steel beams for the open space. We then fit a new fiberglass roof with a flat roof window. Lastly we fitted new glued laminate with new doors and windows and painted all the bottom interior of…