Tilling in Blackrock

  • December 1, 2018
  • dandy21

To fit new tiles in the balcony.   We took off the old slabs. We cleaned the balconies. We put floor leveling in the balconies. We installed new tiles.

Timberframe extension in Donaghmede

  • December 1, 2018
  • dandy21

To make an extension on the first floor.   Outside: We made new timberframe studs 6 x 2, with OSB 3 and cement board.   Inside: We installed air tightness membrane. We put rockwool insulation 150mm in the walls and ceiling. We put plasterboard on the ceiling and insulated plasterboard on the walls.