Kitchen renovation in Stillorgan

  • December 8, 2018
  • dandy21

To renovate the whole kitchen room due to water damage.   We removed the old kitchen. We took off the plasterboard from the walls and ceiling. We installed air tightness membrane. We put new plasterboard and skimmed the walls and ceiling. We fit a new kitchen. We painted the room.      

Laminate in Ranelagh

  • December 8, 2018
  • dandy21

The old laminate was damaged So we fitted new laminate that was thinner on the floor. Our steps: We removed old laminate and trims. We installed the underlay. We fitted new laminate and trims.      

Renovation Dublin 5

  • December 8, 2018
  • dandy21

We had to break the concrete slab above the kitchen firsthand so that we can suspend the house with steel beams for the open space. We then fit a new fiberglass roof with a flat roof window. Lastly we fitted new glued laminate with new doors and windows and painted all the bottom interior of…

Tilling in Blackrock

  • December 1, 2018
  • dandy21

To fit new tiles in the balcony.   We took off the old slabs. We cleaned the balconies. We put floor leveling in the balconies. We installed new tiles.

Timberframe extension in Donaghmede

  • December 1, 2018
  • dandy21

To make an extension on the first floor.   Outside: We made new timberframe studs 6 x 2, with OSB 3 and cement board.   Inside: We installed air tightness membrane. We put rockwool insulation 150mm in the walls and ceiling. We put plasterboard on the ceiling and insulated plasterboard on the walls.